On the subsystems side, the TC link timeout was returned to its normal value of 9 days on 12 January. The TM mode was temporarily changed to “bi-weekly” between 12 and 19 January, to cope with possible reduction of coverage when new Norcia was supporting Mars Express contingency operations.
The payload was inactive in the reporting period, with the exception of SREM measuring radiation in the background.
A total of 3 New Norcia passes were taken over the reporting period.
NNO Pass Date DOY Main Activity
—————————————————————
683 12.01.06 012 Monitor; TC link timeout to 9 days
690 19.01.06 019 Monitor; uplink new Payload off OBCPs
697 26.01.06 026 Monitor; uplink new system OBCPs
At the end of the reporting period (DOY 027) Rosetta was at 377.6 million km from the Earth (2.52 AU; one-way signal travel time was 21m 00s). The distance to the Sun was 259.5 million km (1.72 AU).